PHASE I POWER GRID IMPROVEMENT PLAN

PHASE I – CANYON ROAD TO TAYLOR:
To meet the growing needs of our communities, SUVPS is launching Phase I of the Power Grid Improvement Program. This project will upgrade an existing high-voltage transmission line along:
• Canyon Road
• 400 South
• Scenic Drive
• Arrowhead Trail
• Del Monte Road
• 900 South

The upgraded line will connect to a new
electric substation west of I-15 in Spanish
Fork.

Click to View

KEY IMPROVEMENTS:

  • Replacing older wooden power poles with
    durable steel poles for greater resilience.
  • Relocating existing power poles from
    resident backyards to the street where
    possible.
  • Replacing conductor and hardware to
    support electrical requirements.
  • Construction emphasis:
    • Minimizing disruptions by repairing
      landscaping within the easement area
      after construction.
    • Using the latest construction technologies to protect the surrounding environment while ensuring reliable energy delivery.

This project is designed to not only power
homes and businesses today but also support the future growth of Southern Utah Valley.